Skip to content

Create release.yml

Create release.yml #26

Triggered via push September 20, 2025 01:33
Status Failure
Total duration 17s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.11)
Process completed with exit code 1.
lint
Process completed with exit code 2.
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed