Skip to content

Bump actions/setup-python from 4 to 6 #28

Bump actions/setup-python from 4 to 6

Bump actions/setup-python from 4 to 6 #28

Triggered via pull request September 20, 2025 01:33
Status Failure
Total duration 17s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.9)
Process completed with exit code 1.
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_9" failed
lint
Process completed with exit code 2.