Skip to content

migration(cdw parallel run): ledger row for GREEN scheduled cycle 482474024241636 (+ carry-forward of Sep 2–11 scheduled rows) - #1555

Open
devin-ai-integration[bot] wants to merge 2 commits into
tp-run/databricks-20260901T205306Zfrom
devin/1789192932-cdw-prun-482474024241636
Open

devin-ai-integration[bot] wants to merge 2 commits into
tp-run/databricks-20260901T205306Zfrom
devin/1789192932-cdw-prun-482474024241636

Conversation

@devin-ai-integration

@devin-ai-integration devin-ai-integration Bot commented Sep 12, 2026

Copy link
Copy Markdown
Contributor

Summary

Scheduled ow_tp_cdw_recon cycle 482474024241636 (trigger PERIODIC, 2026-09-12 06:00 UTC) came back GREEN. This PR touches only .migration/08_parallel_run_ledger.md.

Verified against the workspace, not the webhook payload alone:

  • r1_fact_commission and r2_mv_agent_commission_summary both TERMINATED/SUCCESS; r3_notify SUCCESS.
  • Both recon reports (/Volumes/ow_tp/bronze/landing/cdw/recon/482474024241636/<unit>/<unit>.recon.json) cite tolerances v1 + DEGRADED mode, every check pass (rowcount 3/3, row_diff 0/0/0, cents sums 2,880,000 / 7,000 / 7,000, dropped_join_rows 0), idempotency rerun pass with identical row sets.
  • No drift: baseline manifest and feed unchanged, so drift note is none.

Carry-forward (review follow-up). The ten daily ledger PRs #1456, #1480, #1501, #1502, #1503, #1505, #1506, #1536, #1546, #1554 are all still open against the run branch, so the base ledger ends at the Sep 2 drill and the new row alone could not be audited against the consecutive-green requirement. This PR therefore carries one canonical row per scheduled cycle 2026-09-02 → 2026-09-11 (UTC order, PR column = originating PR, drift note flags "keep one copy on merge" so the duplicate is dropped when those PRs land) and records 482474024241636 as the 11th consecutive scheduled green. All eleven PERIODIC runs were re-read from the jobs API and both *.recon.json per run just now: SUCCESS/SUCCESS, PASS/PASS, no missing or red cycle. Sep 11 (509394464811952), whose original PR could not re-read the reports because of a token 403, is now confirmed PASS/PASS; its timestamp is corrected to the run's actual end time 06:01:46Z.

STOP E entry criterion (3 consecutive scheduled greens) was met at 898309753301748 on 2026-09-04. No code, tolerance, or job changes; no cutover action.

make tp-smoke locally stops at the Go leg (go not installed on this VM); the change is markdown-only, so the CI gate is the authority here.

Link to Devin session: https://partner-workshops.devinenterprise.com/sessions/fb89680a7f3d4e6f99c6bcb5ec667cab
Open in Devin Desktop: https://partner-workshops.devinenterprise.com/desktop/session/fb89680a7f3d4e6f99c6bcb5ec667cab?variant=devin
Requested by: @DhrovS


Devin Review

@devin-ai-integration

Copy link
Copy Markdown
Contributor Author

🤖 Devin AI Engineer

I'll be helping with this pull request! Here's what you should know:

✅ I will automatically:

  • Address comments on this PR. Add '(aside)' to your comment to have me ignore it.
  • Look at CI failures and help fix them

Note: I can only respond to comments from users who have write access to this repository.

⚙️ Control Options:

  • Disable automatic comment, CI, and merge conflict monitoring

devin-ai-integration[bot]

This comment was marked as resolved.

…till open) so 482474024241636 is auditable as the 11th consecutive green
@devin-ai-integration devin-ai-integration Bot changed the title migration(cdw parallel run): ledger row for GREEN scheduled cycle 482474024241636 migration(cdw parallel run): ledger row for GREEN scheduled cycle 482474024241636 (+ carry-forward of Sep 2–11 scheduled rows) Sep 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant