chore(deps-dev): update pre-commit requirement from ^3.8 to >=3.8,<5.0 #82
Annotations
5 errors
|
Test with Python 3.11
Process completed with exit code 1.
|
|
Test with Python 3.12
Process completed with exit code 1.
|
|
Test with Python 3.12
The strategy configuration was canceled because "test._3_11" failed
|
|
Test with Python 3.10
The operation was canceled.
|
|
Test with Python 3.10
The strategy configuration was canceled because "test._3_11" failed
|