Skip to content

fixes for dreq

fixes for dreq #7

Triggered via push September 19, 2025 15:55
Status Failure
Total duration 19s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 30.
build (3.x)
Process completed with exit code 30.
build (3.x)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed