Refactor integration test harness #1003
Triggered via pull request
September 28, 2025 22:13
Status
Failure
Total duration
3m 56s
Artifacts
–
ci.yml
on: pull_request
unit-tests
3m 35s
Matrix: integration-tests
Annotations
11 errors
|
integration-tests (bitcoin-cln)
Process completed with exit code 2.
|
|
integration-tests (liquid-cln)
The operation was canceled.
|
|
integration-tests (liquid-cln)
The strategy configuration was canceled because "integration-tests.bitcoin-cln" failed
|
|
integration-tests (misc-integration)
The operation was canceled.
|
|
integration-tests (misc-integration)
The strategy configuration was canceled because "integration-tests.bitcoin-cln" failed
|
|
integration-tests (bitcoin-lnd)
The operation was canceled.
|
|
integration-tests (bitcoin-lnd)
The strategy configuration was canceled because "integration-tests.bitcoin-cln" failed
|
|
integration-tests (liquid-lnd)
The operation was canceled.
|
|
integration-tests (liquid-lnd)
The strategy configuration was canceled because "integration-tests.bitcoin-cln" failed
|
|
integration-tests (lwk-lnd)
The operation was canceled.
|
|
integration-tests (lwk-lnd)
The strategy configuration was canceled because "integration-tests.bitcoin-cln" failed
|