Skip to content

Refactor integration test harness #1015

Refactor integration test harness

Refactor integration test harness #1015

Re-run triggered October 14, 2025 01:40
Status Failure
Total duration 7m 8s
Artifacts

ci.yml

on: pull_request
unit-tests
44s
unit-tests
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests (liquid-cln)
Process completed with exit code 2.
integration-tests (bitcoin-lnd)
The operation was canceled.
integration-tests (bitcoin-lnd)
The strategy configuration was canceled because "integration-tests.liquid-cln" failed
integration-tests (bitcoin-cln)
The operation was canceled.
integration-tests (bitcoin-cln)
The strategy configuration was canceled because "integration-tests.liquid-cln" failed