Refactor integration test harness #1015
ci.yml
on: pull_request
unit-tests
44s
Matrix: integration-tests
Annotations
5 errors
|
integration-tests (liquid-cln)
Process completed with exit code 2.
|
|
integration-tests (bitcoin-lnd)
The operation was canceled.
|
|
integration-tests (bitcoin-lnd)
The strategy configuration was canceled because "integration-tests.liquid-cln" failed
|
|
integration-tests (bitcoin-cln)
The operation was canceled.
|
|
integration-tests (bitcoin-cln)
The strategy configuration was canceled because "integration-tests.liquid-cln" failed
|