Skip to content

Refactor integration test harness #1017

Refactor integration test harness

Refactor integration test harness #1017

Re-run triggered October 15, 2025 01:40
Status Failure
Total duration 5m 8s
Artifacts

ci.yml

on: pull_request
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
integration-tests (misc-integration)
Process completed with exit code 2.
integration-tests (liquid-cln)
The operation was canceled.
integration-tests (liquid-cln)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (bitcoin-lnd)
The operation was canceled.
integration-tests (bitcoin-lnd)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (liquid-lnd)
The operation was canceled.
integration-tests (liquid-lnd)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (bitcoin-cln)
The operation was canceled.
integration-tests (bitcoin-cln)
The strategy configuration was canceled because "integration-tests.misc-integration" failed