Skip to content

Refactor integration test harness #1018

Refactor integration test harness

Refactor integration test harness #1018

Triggered via pull request October 15, 2025 03:30
Status Failure
Total duration 4m 13s
Artifacts

ci.yml

on: pull_request
unit-tests
46s
unit-tests
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
integration-tests (misc-integration)
Process completed with exit code 2.
integration-tests (bitcoin-lnd)
The operation was canceled.
integration-tests (bitcoin-lnd)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (bitcoin-cln)
The operation was canceled.
integration-tests (bitcoin-cln)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (liquid-cln)
The operation was canceled.
integration-tests (liquid-cln)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
integration-tests (liquid-lnd)
The operation was canceled.
integration-tests (liquid-lnd)
The strategy configuration was canceled because "integration-tests.misc-integration" failed
unit-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2