build #3814
build.yml
on: schedule
Matrix: pretest
pre-commit
50s
test-dashboard-build
Matrix: backward-compatibility
Matrix: test-long-algos
Matrix: test
Annotations
3 errors
|
pretest (pylint)
Process completed with exit code 2.
|
|
pretest (docs)
The operation was canceled.
|
|
pretest (docs)
The strategy configuration was canceled because "pretest.pylint" failed
|