Milestones
List view
Consolidation after the layer milestones: follow-ups from the 2026-11 architecture review (validator, change tool, renderer, tests and CI, decision history, arc42, documentation structure). Scheduled after v0.4.0; includes re-checking the Layer 4 deliverables against the consolidated baseline.
No due date•0/44 issues closedUnified CLI; CI/CD validating all artifacts; back-generator to HTML/DB-UX; complete framework documentation. Covers AP3 (full).
No due date•0/5 issues closedRailway assessment profile over NIST Assessment Results; assessment example against BS-KI.
No due date•0/3 issues closedStructured change notifications with railway classification (added/removed/tightened/relaxed/content-changed); change schema; diff tool on oscal-deep-diff basis. Covers AP4.
No due date•3/4 issues closedRules Layer spec + schema; AMC schema; generic applicability-sources slot; interface to Rulemapping/OpenCode. Covers AP1b.
No due date•15/15 issues closedReproducible base schema from NIST releases; OSCAL4Rail catalog constraints; Regulatory Cascade as OSCAL Profile chain + Control Mapping; consolidated validator green against real catalogs; back-generator MVP. Covers AP1, AP2, AP3 (start).
No due date•7/8 issues closed