Skip to content

Add --hip-link to target_id check (#275) #1289

Add --hip-link to target_id check (#275)

Add --hip-link to target_id check (#275) #1289

Triggered via push October 3, 2025 16:04
Status Failure
Total duration 1m 52s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (ubuntu-24.04, 3.16.3)
Process completed with exit code 1.
test (windows-2022, 3.31.0)
The operation was canceled.
test (windows-2022, 3.31.0)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed
test (ubuntu-24.04, 3.22.1)
The operation was canceled.
test (ubuntu-24.04, 3.22.1)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed
test (ubuntu-24.04, 3.31.0)
The operation was canceled.
test (ubuntu-24.04, 3.31.0)
The strategy configuration was canceled because "test.ubuntu-24_04_3_16_3" failed