Skip to content

trying to fix dep issue seperately #3

trying to fix dep issue seperately

trying to fix dep issue seperately #3

Triggered via push June 18, 2025 09:24
Status Failure
Total duration 32s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
Process completed with exit code 1.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.8)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_11" failed