[Snyk] Upgrade @fullcalendar/daygrid from 6.1.10 to 6.1.19#1901
Open
e-Evolution wants to merge 1 commit intodevelopfrom
Open
[Snyk] Upgrade @fullcalendar/daygrid from 6.1.10 to 6.1.19#1901e-Evolution wants to merge 1 commit intodevelopfrom
e-Evolution wants to merge 1 commit intodevelopfrom
Conversation
Snyk has created this PR to upgrade @fullcalendar/daygrid from 6.1.10 to 6.1.19. See this package in npm: @fullcalendar/daygrid See this project in Snyk: https://app.snyk.io/org/e-evolution/project/cf2abcde-2ee9-4c5f-9631-69916544bee4?utm_source=github&utm_medium=referral&page=upgrade-pr
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Snyk has created this PR to upgrade @fullcalendar/daygrid from 6.1.10 to 6.1.19.
ℹ️ Keep your dependencies up-to-date. This makes it easier to fix existing vulnerabilities and to more quickly identify and fix newly disclosed vulnerabilities when they affect your project.
The recommended version is 8 versions ahead of your current version.
The recommended version was released 2 months ago.
Release notes
Package name: @fullcalendar/daygrid
-
6.1.19 - 2025-08-10
- feature: Angular 20 support (#7946)
- feature: setting to control how nowIndicator displays in all-day slots (#6175)
- fix: allow business hours that START past midnight (#7934)
-
6.1.18 - 2025-06-30
- fix: Optimize custom content-injection rerendering performance (#3003, #7650)
-
6.1.17 - 2025-04-02
- fix: recurring event start/end time not updated when timezone changed (#5273)
- fix: nowIndicator not updated when timezone changed (#5753)
- fix: nowIndicator lags after returning to suspended tab (#7806)
- fix: "today" date does not update after current time crosses midnight (#3783)
- fix: day header 1 day behind with Luxon & timezone with midnight DST (#7633)
- fix: in timeline, incorrect navLink for granularities other than day/week (#4931)
- fix: validRange in multiMonth view does not render all the days (#7287)
- angular: Accept TempateRef for
-
6.1.15 - 2024-07-12
- fix: dragScroll does not work on multiMonth view (#7324)
- fix: clicking on nowIndicator line ignores the event behind (#6801)
- fix: dates not selectable in Shadow DOM since v6.1.12 (#7685)
- fix: adaptive print version shows events with custom eventContent with zero height (#7419)
-
6.1.14 - 2024-06-05
- React 19 support
- Angular 18 support (#7682)
-
6.1.13 - 2024-05-22
- follow-up fix to #7533 that improves event-dragging from timed to all-day
- follow-up fix to #7335 that sidesteps issues with dynamically loaded fonts
-
6.1.12 - 2024-05-21
- fix: don't allow event drag-n-drop on obscured calendars (#5026)
- fix: when moving event from all-day -> timed, use literal mouse position for event drop (#7533)
- fix: timeline rtl initial scroll on Chrome (#7335)
-
6.1.11 - 2024-02-20
- fix: fc-event-past className not attached to events that end midnight before today (#6120, #6486)
- fix: aria-labelledby on view container should not exist when headerToolbar:false (#6884)
- fix: possible infinite recursion with dayGrid, dayMaxEventRows, and many hidden event rows (#7462)
- fix: possible +more link numbers incorrect (#7573, #6608, #6900)
- fix: events incorrectly positioned w/ React strict-mode (#7574, #7389, #7400)
- fix: Angular 17 SRR error with el.getRootNode (#7550)
-
6.1.10 - 2023-11-29
- feature: Angular version 17 support (#7525)
- fix: Vue 3 background event with custom rendering, not receiving el in eventDidMount (#7524)
- fix: font-icon elements should have role="img" (#7501)
- locale: fix bg (#7493)
- locale: fix ca (#7394)
- locale: fix nl (#7471)
from @fullcalendar/daygrid GitHub release notes(
nowIndicatorSnap; usefalseto ensure time-granularity always)📢 FYI, read an update about v7 »
(Especially important for event rerendering with
eventContent)resourceAreaColumns.cellContent(#7894), thx @ gongAllGeneral
React
React
Angular
TimeGrid
Timeline
General
TimeGrid
Timeline
General
DayGrid and MultiMonth
React
Angular
Important
Note: You are seeing this because you or someone else with access to this repository has authorized Snyk to open upgrade PRs.
For more information: