chore(deps): bump react-map-gl from 6.1.21 to 8.1.0 in /superset-frontend #21522
Annotations
5 errors
pre-commit (previous)
Process completed with exit code 1.
|
pre-commit (current)
The operation was canceled.
|
pre-commit (current)
The strategy configuration was canceled because "pre-commit.previous" failed
|
pre-commit (next)
The operation was canceled.
|
pre-commit (next)
The strategy configuration was canceled because "pre-commit.previous" failed
|