Skip to content

changelog: journeys - #368

Merged
jsfez merged 1 commit into
mainfrom
jeremy/journey-changelog
Sep 12, 2026
Merged

jsfez merged 1 commit into
mainfrom
jeremy/journey-changelog

Conversation

@jsfez

@jsfez jsfez commented Sep 12, 2026 •

Copy link
Copy Markdown
Collaborator

Replaces #352, which described the Flows tab and the flow page: neither shipped. What did ship is the journey strip in the build review, merged as argos-ci/argos#2573 on 2026-09-09 and live in the app, with the SDK capture order released on 2026-09-11.

Dated 2026-09-12, so it publishes as soon as this lands.

What the entry covers

Only what is in production: the Journey toolbar button, the strip built from the whole build so unchanged steps are in it and the ones needing review are dotted, and ⇧ ← / ⇧ →. Nothing about the Flows tab, the flow page, journey ordering of the diff list, or the flow line above the screenshot name: those were left out of #2573 on purpose.

Length

165 words, 3 bullets, no code block, which is the shape the comparable entries take. The other build-review features sit between 63 and 140 words (changes-highlighter 63, variant-selector 93, screenshot-filters 98, tests-dashboard 105, deployments 140). The recent 250 to 280 word entries are all multi-surface features with a CLI, an SDK and an API to cover, which this one does not have. The Storybook derivation and the capture-order fallback live in the docs instead.

The illustration is generated from the official pastel background with the changelog-image skill, same as the other entries.

Docs for it: argos-ci/docs#256. The closing link points at its new section, so it resolves once that lands.

Verified with SHOW_SCHEDULED_ARTICLES=true corepack pnpm build, the entry renders at /changelog/2026-09-12-journeys.

No em-dashes in the copy.

Typefully draft not created: say the word and I will draft the X and Bluesky thread from this entry.

🤖 Generated with Claude Code

@vercel

vercel Bot commented Sep 12, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
argos-website Ready Ready Preview Sep 12, 2026 11:12am UTC

Request Review

@argos-ci

argos-ci Bot commented Sep 12, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Argos notifications ↗︎

Build Status Details Updated (UTC)
local (Inspect) 👍 Approved by Jeremy SFEZ 6 changed Sep 12, 2026, 11:14 AM

The journey strip in the build review, shipped in argos-ci/argos#2573 and
live since 2026-09-09, with the SDK capture order released on 2026-09-11.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
@jsfez
jsfez force-pushed the jeremy/journey-changelog branch from 40c1895 to 4d98929 Compare September 12, 2026 11:11
@jsfez
jsfez merged commit 1cc9a98 into main Sep 12, 2026
6 checks passed
@jsfez
jsfez deleted the jeremy/journey-changelog branch September 12, 2026 11:27

This branch was successfully deployed

1 active deployment
Preview — 4d98929c Deployed Sep 12, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant