update bigwig_to_bedgraph dependency #3399
Triggered via pull request
October 18, 2025 06:46
Status
Cancelled
Total duration
1m 13s
Artifacts
–
pr.yaml
on: pull_request
Matrix: Setup cache and determine changed repositories
Matrix: Lint tool-list
Matrix: Lint Python scripts
Matrix: Lint R scripts
Matrix: Test tools
Matrix: Combine chunked test results
Matrix: Deploy
Check workflow success
2s
Report deploy status
Annotations
4 errors
|
Setup cache and determine changed repositories (3.11)
Canceling since a higher priority waiting request for pr-refs/pull/1689/merge exists
|
|
Setup cache and determine changed repositories (3.11)
The operation was canceled.
|
|
Check workflow success
Process completed with exit code 1.
|
|
Galaxy Tool Linting and Tests for push and PR
Canceling since a higher priority waiting request for pr-refs/pull/1689/merge exists
|