Skip to content

Sync GitHub issues to Jira #146

Sync GitHub issues to Jira

Sync GitHub issues to Jira #146

Triggered via pull request August 13, 2025 16:16
Status Failure
Total duration 2m 17s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  Plan
5s
integration-tests / Plan
Matrix: integration-tests / build
integration-tests  /  Plan Image Scanning
0s
integration-tests / Plan Image Scanning
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
Matrix: integration-tests / scan
integration-tests  /  Required Integration Test Status Checks
3s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

3 errors
integration-tests / Build docker-image (mattermost)
The process '/usr/bin/docker' failed with exit code 1
integration-tests / Build charm (mattermost-k8s)
The operation was canceled.
integration-tests / Build charm (mattermost-k8s)
The strategy configuration was canceled because "integration-tests.build.docker-image_mattermost_m" failed

Artifacts

Produced during runtime
Name Size Digest
2025-08-13T16-16-52-a379__plan
347 Bytes
sha256:96bf75eb3e62ee2c8369dc468a1701b0b8481fe781132fb458d358501cda9468