Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Original file line number Diff line number Diff line change
Expand Up @@ -39,6 +39,7 @@ Every 4 months, the Celestia Foundation will distribute a portion of the Foundat
| Cohort 5 | 15 | 12 months | Cohort 8 |
| Cohort 6 | 15 | 12 months | Cohort 9 |
| Cohort 7 | 20 | 12 months | Cohort 10 |
| Cohort 8 | TBD | 12 months | Cohort 11 |

This structure allows for a steady flow of both existing applicants and new applicants to maintain a stable set of participants in the program.

Expand Down Expand Up @@ -126,3 +127,5 @@ The Foundation will report each cohort’s composition and the duration of their
- [Cohort 4](https://docs.google.com/spreadsheets/d/1Fxu9uYJ4wxfHChEiSg5bmXAMU8IZSq7J3GYDCFgk1HA/edit?gid=1814073511#gid=1814073511): 20 Validator Seats (Applications open February 1, 2025)
- [Cohort 5](https://docs.google.com/spreadsheets/d/1Fxu9uYJ4wxfHChEiSg5bmXAMU8IZSq7J3GYDCFgk1HA/edit?gid=1471991269#gid=1471991269): 15 Validator Seats (Applications open June 1, 2025)
- [Cohort 6](https://docs.google.com/spreadsheets/d/1Fxu9uYJ4wxfHChEiSg5bmXAMU8IZSq7J3GYDCFgk1HA/edit?gid=1010270944): 15 Validator Seats (Applications open October 1, 2025)
- [Cohort 7](https://forum.celestia.org/t/foundation-delegation-cohort-7-is-live/2232): 20 Validator Seats (Applications open February 1, 2026)
- Cohort 8: Applications open June 1, 2026 (validators selected in Cohort 5 must reapply)
Loading