-
Notifications
You must be signed in to change notification settings - Fork 64
Milestones
List view
Break the icons into groups and start working through updating the icons in each group and then flowing them into the web doc as each group is completed.
Due by January 26, 2018•7/7 issues closedReview and edit the hypothesis based on the feedback about canvas size, icon size, and line weights then re-test the icons in place.
Due by January 19, 2018•6/6 issues closedTest all the things! Let's get a draft set of icons into real context so we can be sure we're on the right track.
Due by January 12, 2018•9/9 issues closedFinish up some left over tasks with the half week we have post-holidays
Due by January 5, 2018Discovery and defining tasks to get things rolling.
Due by December 22, 2017•4/4 issues closed- No due date
- Due by June 29, 2015•6/6 issues closed
Tasks to complete by the end of May
Due by May 25, 2015•2/2 issues closedTasks to complete at the end of April
Due by April 27, 2015•3/3 issues closedThese issues have a decision, but they now need to be incorporated into the design manual. Once they've gotten into the manual, issues should be closed out.
No due date•15/15 issues closedUse this milestone to capture all issues related to maintaining the design manual—design, front end, content, bugs, etc. This Milestone collects issues leading up to "Release 1" targeted for May 16
Due by May 16, 2014•54/54 issues closed