Milestones

List view

  • Break the icons into groups and start working through updating the icons in each group and then flowing them into the web doc as each group is completed.

    Due by January 26, 2018
    7/7 issues closed
  • Review and edit the hypothesis based on the feedback about canvas size, icon size, and line weights then re-test the icons in place.

    Due by January 19, 2018
    6/6 issues closed
  • Test all the things! Let's get a draft set of icons into real context so we can be sure we're on the right track.

    Due by January 12, 2018
    9/9 issues closed
  • Finish up some left over tasks with the half week we have post-holidays

    Due by January 5, 2018
  • Discovery and defining tasks to get things rolling.

    Due by December 22, 2017
    4/4 issues closed
  • No due date
  • Due by June 29, 2015
    6/6 issues closed
  • Tasks to complete by the end of May

    Due by May 25, 2015
    2/2 issues closed
  • Tasks to complete at the end of April

    Due by April 27, 2015
    3/3 issues closed
  • These issues have a decision, but they now need to be incorporated into the design manual. Once they've gotten into the manual, issues should be closed out.

    No due date
    15/15 issues closed
  • Use this milestone to capture all issues related to maintaining the design manual—design, front end, content, bugs, etc. This Milestone collects issues leading up to "Release 1" targeted for May 16

    Due by May 16, 2014
    54/54 issues closed