Repository navigation
fix(ci): reconcile main gate execution, provenance and workflow security - #18209
Draft
diegosouzapw wants to merge 14 commits into
Draft
diegosouzapw wants to merge 14 commits into
diegosouzapw wants to merge 14 commits into
Conversation
Reconcile immutable OpenAPI baselines, required audits, hosted receipts, workflow pins and cache trust, repository identity and test registration. Co-authored-by: Bob.Hou <houminxi@gmail.com>
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Main lacks the recovery controls for immutable OpenAPI comparisons, complete independent-package audits, declared static requirements, interrupted-process classification and exact hosted-suite provenance. Scheduled guards also used the pre-transfer repository owner.
Backport those controls, pin workflow dependencies, remove release cache reuse, keep supported patched Node versions and clean npm installs, and align guards with cheaper-inference/OmniRoute. Include the registration-order gate and #18046 fixes with contributor credit. Reconcile main-specific aliases and remove one proven stale allowlist entry.
The UI inventory uses four required shards with at most two workers and a receipt for every shard. Prepare real dependencies before timed assertions, enable React act checks and require fresh complete lint measurements. Required secret scans reject absent tools/source/baseline, invalid reports and scanner failures. Catalog prefix lookup avoids repeated full alias scans; limiter and streaming fixtures preserve the real runtime behavior with controlled timing. Translation reuse requires literal validation, source provenance and matching target hashes.
Unit coverage now collects V8 data during the original test invocation, compresses the raw bytes losslessly and generates the report once. The CI and Release-Green matrices require twelve unit shards under the existing deadlines. Final coverage validates all shard identities/hashes and preserves c8's global filename order; it rejects missing, mixed, duplicate or damaged inputs and still enforces the existing coverage thresholds.
Current head:
841633ad714e89ba88a12480a5afe99981a94a42; main base:edab7c3a59bf7d6f040d581dbda3a46adbee0d57.Validation is scoped; these overlapping batteries are not an additive test total:
Actual mirror recovery is prepared separately in #18210. The combined main candidate also includes the separate dependency-security recovery #18174; this PR alone is not that combined candidate. Full main unit/UI/integration/coverage/build/package/boot and hosted acceptance remain pending. Draft recovery for #17267; no main merge, ruleset activation or deployment is certified by these focused results.