Skip to content

fix bug and prepare for modification to feasibility pump #269

fix bug and prepare for modification to feasibility pump

fix bug and prepare for modification to feasibility pump #269

Triggered via push September 6, 2025 09:27
Status Failure
Total duration 3m 52s
Artifacts

linux-ci.yml

on: push
Matrix: Run tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Run tests (ubuntu-22.04, false, ADD_CXXFLAGS=-fvisibility=hidden, sudo apt install -y -qq gfortra...
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed
Run tests (ubuntu-24.04, false, ADD_CXXFLAGS=-fvisibility=hidden, sudo apt install -y -qq gfortra...
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed
Run tests (ubuntu-24.04, true, ADD_CXXFLAGS=-fvisibility=hidden, sudo apt install -y -qq gfortran...
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed
Run tests (ubuntu-22.04, true, ADD_CXXFLAGS=-fvisibility=hidden, sudo apt install -y -qq gfortran...
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed
Run tests (macos-13, false, CC=gcc-13 CXX=g++-13 OSX=13 ADD_CXXFLAGS=-Wl,-ld_classic, brew instal...
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed
Run tests (macos-13, false, CC=clang OSX=13, brew install metis bash)
The operation was canceled.
Run tests (macos-13, false, CC=clang OSX=13, brew install metis bash)
The strategy configuration was canceled because "test.macos-14_false_CC_gcc-13_" failed