Skip to content

Merge pull request #56 from darshan-hpc/snyder/add-dlio-logs #113

Merge pull request #56 from darshan-hpc/snyder/add-dlio-logs

Merge pull request #56 from darshan-hpc/snyder/add-dlio-logs #113

Triggered via push April 29, 2025 18:39
Status Failure
Total duration 4m 20s
Artifacts

main_ci.yml

on: push
Matrix: test_log_repo
Fit to window
Zoom out
Zoom in

Annotations

20 errors
test_log_repo (macos-latest, 3.11)
Process completed with exit code 1.
test_log_repo (macos-latest, 3.12)
Process completed with exit code 1.
test_log_repo (macos-latest, 3.12)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (ubuntu-latest, 3.11)
The operation was canceled.
test_log_repo (ubuntu-latest, 3.11)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (ubuntu-latest, 3.10)
The operation was canceled.
test_log_repo (ubuntu-latest, 3.10)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (ubuntu-latest, 3.9)
The operation was canceled.
test_log_repo (ubuntu-latest, 3.9)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (ubuntu-latest, 3.12)
The operation was canceled.
test_log_repo (ubuntu-latest, 3.8)
The operation was canceled.
test_log_repo (ubuntu-latest, 3.8)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (ubuntu-latest, 3.12)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (macos-latest, 3.9)
The operation was canceled.
test_log_repo (macos-latest, 3.9)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (macos-latest, 3.8)
The operation was canceled.
test_log_repo (macos-latest, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 25.0.1 [notice] To update, run: python3.8 -m pip install --upgrade pip
test_log_repo (macos-latest, 3.8)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed
test_log_repo (macos-latest, 3.10)
The operation was canceled.
test_log_repo (macos-latest, 3.10)
The strategy configuration was canceled because "test_log_repo.macos-latest_3_11" failed