File Nodes

Each row names the file's graph role. "Downstream" means the file that should be read next when following implementation or review consequences.

File Role Downstream
PATTERN-SYNTHESIS.md Source pattern library for P2P security controls. MULTIAGENT-SWARM-SECURITY-ANALYSIS.md, DELIVERABLE-4-THREAT-MODEL-REGENERATED.md
PATTERN-MULTIAGENT-EXECUTION-PLAN.md Execution plan for turning pattern research into deliverables. PHASE-0-TASK-LIST.md
MULTIAGENT-SWARM-SECURITY-ANALYSIS.md Maps swarm topology to threat categories and gaps. DELIVERABLE-4-THREAT-MODEL-REGENERATED.md, ../../../SECURITY.md
DELIVERABLE-1-PEER-OBSERVATION-MODEL-EXPANDED.md Expanded schema and confidence design. DELIVERABLE-1-PEER-OBSERVATION-MODEL-REGENERATED-ITERATION-2.md
DELIVERABLE-1-PEER-OBSERVATION-MODEL-REGENERATED-ITERATION-2.md Repaired canonical PeerObservation and multiplicative confidence formula. peer_observation_tdd.md, 2026-07-11-state-transition-manager-integration-plan.md
peer_observation_tdd.md Test vectors and fixtures for schema, immutability, and scoring. TASK_A2_FINDINGS.md
TASK_A2_FINDINGS.md Implementation findings for confidence scoring. PHASE-0-FIX-3-AND-MEDIUM-ITEMS-DECISION-BRIEF.md
DELIVERABLE-2-HEARTBEAT-LIVENESS-REGENERATED.md Liveness, timeout, failure detector, and hysteresis contract. 2026-07-11-state-transition-manager-integration-plan.md, PHASE-1-SCOPE-DRAFT.md
DELIVERABLE-4-THREAT-MODEL-REGENERATED.md Threat model T1-T7. 2026-07-12-stm-next-increment-plan.md, security-trace.md
MEDIUM-ITEMS-DECISION-MATRICES.md Decision matrix for sequence width, ghost peers, STM protection, gates, fallback, eviction, and rate limiting. PHASE-0-FIX-3-AND-MEDIUM-ITEMS-DECISION-BRIEF.md
PHASE-0-FIX-3-AND-MEDIUM-ITEMS-DECISION-BRIEF.md Reconciles conflicting STM model assumptions. 2026-07-11-state-transition-manager-integration-plan.md
PHASE-0-TASK-LIST.md Original TDD-first work breakdown, later partly superseded by shipped STM path. PHASE-1-SCOPE-DRAFT.md
PHASE-1-SCOPE-DRAFT.md Phase 0 to Phase 1 handoff model. PHASE-2-JOB-BOARD.md
2026-07-11-phase1b-integration-review.md Finds the cross-module integration gap. 2026-07-11-state-transition-manager-integration-plan.md
2026-07-11-state-transition-manager-integration-plan.md Central STM integration plan. 2026-07-11-pr203-multiagent-orchestration.md, 2026-07-12-stm-remediation-plan.md
2026-07-11-pr203-multiagent-orchestration.md Assigns PR #203 multi-agent execution. 2026-07-11-PR203-BLEND-VERDICT.md
2026-07-11-PR203-BLEND-VERDICT.md Reconciles competing PR #203 lineages. README-PR203-BLEND.md
README-PR203-BLEND.md Agent navigator for the blend strategy. 2026-07-11-PHASE-2-BLOCKERS.md
2026-07-11-PHASE-2-BLOCKERS.md Deferred concurrency and dedup blockers. 2026-07-12-autoplan-final-approval-gate.md
2026-07-12-autoplan-final-approval-gate.md Final approval gate for PR #205. 2026-07-12-stm-next-increment-plan.md
2026-07-12-stm-remediation-plan.md Short remediation plan for production wiring and threat re-check. 2026-07-12-stm-next-increment-plan.md
2026-07-12-stm-next-increment-plan.md Closed plan for next STM increment and P5/P6/P13 hardening gate. docs/next, ../../../SECURITY.md
Review voice folders CEO and engineering evidence packs, with stale/false claims preserved and annotated. 2026-07-12-autoplan-final-approval-gate.md