chore(deps): Bump serde from 1.0.215 to 1.0.216 (#900) #886
docker.yml
on: push
Push Client Image
10h 0m
Push Dfinit Image
10h 0m
Annotations
4 errors
Push Client Image
The job running on runner large-runner-3 has exceeded the maximum execution time of 600 minutes.
|
Push Client Image
The operation was canceled.
|
Push Dfinit Image
The job running on runner large-runner-2 has exceeded the maximum execution time of 600 minutes.
|
Push Dfinit Image
The operation was canceled.
|