Skip to content

[9.4] [SecuritySolution][Navigation] Fix launchpad order in classic global nav (#268216)#268466

Merged
kibanamachine merged 1 commit into
elastic:9.4from
kibanamachine:backport/9.4/pr-268216
May 8, 2026
Merged

[9.4] [SecuritySolution][Navigation] Fix launchpad order in classic global nav (#268216)#268466
kibanamachine merged 1 commit into
elastic:9.4from
kibanamachine:backport/9.4/pr-268216

Conversation

@kibanamachine
Copy link
Copy Markdown
Contributor

Backport

This will backport the following commits from main to 9.4:

Questions ?

Please refer to the Backport tool documentation

…nav (elastic#268216)

> [!Note]
> `9.4.1` FF day is 8th of May so it should be merged today, preferably

## Summary

The launchpad item is below `Manage` item on the classic global sidenav
instead of above it. This PR fixes that and moves it above `Manage` just
like it is in the Security Solution classic nav.

<details><summary>Current Security Solution classic nav</summary>
<img width="250" height="721" alt="Screenshot 2026-05-07 at 11 36 20"
src="https://github.com/user-attachments/assets/7a34b2a0-a6e3-4b38-8952-136ba432a436"
/>
</details>

<details><summary>Current global side nav</summary>
<img width="265" height="1135" alt="Screenshot 2026-05-07 at 16 58 03"
src="https://github.com/user-attachments/assets/d7d50cf0-be9b-42e9-832c-25327e068598"
/>
</details>

<details><summary>Fixed global side nav</summary>
<img width="293" height="1161" alt="Screenshot 2026-05-07 at 17 00 49"
src="https://github.com/user-attachments/assets/8b0092f5-0a00-4ee6-a7da-e3184c71f774"
/>
</details>

related to elastic#260429

### Checklist

Check the PR satisfies following conditions.

Reviewers should verify this PR satisfies this list as well.

- [ ] Any text added follows [EUI's writing
guidelines](https://elastic.github.io/eui/#/guidelines/writing), uses
sentence case text and includes [i18n
support](https://github.com/elastic/kibana/blob/main/src/platform/packages/shared/kbn-i18n/README.md)
- [ ]
[Documentation](https://www.elastic.co/guide/en/kibana/master/development-documentation.html)
was added for features that require explanation or tutorials
- [ ] [Unit or functional
tests](https://www.elastic.co/guide/en/kibana/master/development-tests.html)
were updated or added to match the most common scenarios
- [ ] If a plugin configuration key changed, check if it needs to be
allowlisted in the cloud and added to the [docker
list](https://github.com/elastic/kibana/blob/main/src/dev/build/tasks/os_packages/docker_generator/resources/base/bin/kibana-docker)
- [ ] This was checked for breaking HTTP API changes, and any breaking
changes have been approved by the breaking-change committee. The
`release_note:breaking` label should be applied in these situations.
- [ ] [Flaky Test
Runner](https://ci-stats.kibana.dev/trigger_flaky_test_runner/1) was
used on any tests changed
- [ ] The PR description includes the appropriate Release Notes section,
and the correct `release_note:*` label is applied per the
[guidelines](https://www.elastic.co/guide/en/kibana/master/contributing.html#kibana-release-notes-process)
- [ ] Review the [backport
guidelines](https://docs.google.com/document/d/1VyN5k91e5OVumlc0Gb9RPa3h1ewuPE705nRtioPiTvY/edit?usp=sharing)
and apply applicable `backport:*` labels.

### Identify risks

Does this PR introduce any risks? For example, consider risks like hard
to test bugs, performance regression, potential of data loss.

Describe the risk, its severity, and mitigation for each identified
risk. Invite stakeholders and evaluate how to proceed before merging.

- [ ] [See some risk
examples](https://github.com/elastic/kibana/blob/main/RISK_MATRIX.mdx)
- [ ] ...

(cherry picked from commit 2dd76a3)
@kibanamachine kibanamachine added the backport This PR is a backport of another PR label May 8, 2026
@kibanamachine kibanamachine enabled auto-merge (squash) May 8, 2026 14:31
@kibanamachine
Copy link
Copy Markdown
Contributor Author

💚 Build Succeeded

Metrics [docs]

Page load bundle

Size of the bundles that are downloaded on every page load. Target size is below 100kb

id before after diff
securitySolution 147.4KB 147.4KB -21.0B

cc @ashokaditya

@kibanamachine kibanamachine merged commit 6b92ccb into elastic:9.4 May 8, 2026
34 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants