Skip to content

exactlyallan/GMW-325

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

5 Commits
 
 
 
 

Repository files navigation

GMW 325

Tracker for e30 LS3 LT1 gen V swap project.

High Level OOO | 2026

  • Move back into garage + build workbench
  • Move e30 back into garage
  • Fabricate removable frontend (pita now for less pita future)
  • Temporarily mount transmission to engine
  • Make front end removable
  • Finish engine mounts
    • SCS components (block mount + tabs)
    • Order Bushing (DOM)
    • Fabricate
  • Finish transmission mounts
    • Order shifter relocation kit
    • Find mount points + get right angle
    • Fabricate (use current transmission bushings)
  • Fabricate transmission tunnel
    • Scan and triple check dimensions
    • Finish onShape layout
      • Firewall mounts
      • Control panel mounts
      • Access ports
      • Shifter port
    • Convert to sheet bends in onShape
    • Order SCS
    • Weld in place
    • Seam seal
  • Clean up engine bay (i.e. paint)
  • Fabricate steering column + pedal box + digital dash mount
    • Order master cylinders (clutch, rear, front brake)
    • Fabricate acceleration pedal mount to pedal box
    • Make adjustable steering column mount
    • Temp mount engine + steering rack
    • Temp mount seat
    • Order steering univeral joints
    • Cross fingers
  • Patch sunroof
    • Clean rust
    • Fab panel
  • Deep clean interrior
  • Paint interrior (remove windows?!)

Electrical and Integration

  • Install engine harness
    • Setup battery wiring
    • Setup fuse box
    • Locate ECU
    • Emergency shutoff
    • ...
  • Setup digital dash system
  • Build electrical and aux systems
    • Order
    • Wipers
    • Horn
    • Headlights
    • Tail / Brake Lights
    • Turn signals
    • Interrior Lights
    • Aux
    • ...
  • Integration
    • Hook up VSS from bowler box
    • Hook up brake pedal signal
    • Hook up all sensor wires
    • MIL light
    • ...

Later To Dos

  • Order radiator and oil cooler + accumilator kits
    • Plan and fab radiator ducting + airbox intake
    • Clean up hood + cut matching holes for ducting
  • Build Brake System
    • Route brake lines (and or de-rust and clean out)
    • Order used MK60 ABS unit
    • Order converter unit
    • Wire up
    • Order brake pads
    • Pray and tripple check...
  • Fabricate gas tank fuel pump ring
    • Weld patch hole
    • De-rust and recoat interrior
    • Install fuel pump
  • Build Fuel system
    • Plumb fuel lines
    • Plumb charcol system
    • Plumb evap system
    • Pressure test
    • Cross fingers and tripple check with B.A.R rules
  • Fabricate exhaust
  • Order drive shaft

Side Projects

  • Convert windows to crank windows
  • Convert side mirrors to manual

Start and drive this car... at some point. WTF have I gotten into.

About

Tracker for E30 LT1 genV swap project

Topics

Resources

Stars

Watchers

Forks

Contributors