Skip to content

added draft test of trying out a modified withdrawal contract that al… #35

added draft test of trying out a modified withdrawal contract that al…

added draft test of trying out a modified withdrawal contract that al… #35

Triggered via push March 25, 2025 11:18
Status Failure
Total duration 6m 13s
Artifacts

tox_verify.yaml

on: push
Lint python sources with ruff
9s
Lint python sources with ruff
Typecheck python sources with mypy
26s
Typecheck python sources with mypy
Spellcheck sources with pyspelling
35s
Spellcheck sources with pyspelling
Lint markdown files with markdownlint
7s
Lint markdown files with markdownlint
Build html documentation with mkdocs
2m 28s
Build html documentation with mkdocs
Matrix: pytest_framework
Matrix: tests_deployed
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Lint python sources with ruff
Process completed with exit code 1.
Fill tests, deployed, ubuntu-latest, 3.11
Process completed with exit code 1.
Fill tests, deployed, macos-latest, 3.12
The operation was canceled.
Fill tests, deployed, macos-latest, 3.12
The strategy configuration was canceled because "tests_deployed.ubuntu-latest_3_11" failed