Skip to content

docs(v1.100): mark pre-PR-23 blocker #1 LANDED (PR-P2-1 / PR #484)#485

Merged
itcmsgr merged 2 commits intomainfrom
chore/v1.100-blocker-tracking-pr-p2-1-landed
Apr 20, 2026
Merged

docs(v1.100): mark pre-PR-23 blocker #1 LANDED (PR-P2-1 / PR #484)#485
itcmsgr merged 2 commits intomainfrom
chore/v1.100-blocker-tracking-pr-p2-1-landed

Conversation

@itcmsgr
Copy link
Copy Markdown
Owner

@itcmsgr itcmsgr commented Apr 20, 2026

Tracking-only. PR-P2-1 (prior-authority record hardening) merged as 3b834033. Updates the blocker table in internal/installer/uninstall/contract.md so reviewers of future pre-PR-23 PRs see item 1 struck through with explicit LANDED status + merge SHA.

Items 2–6 remain pending; each stays its own bounded PR with micro-contract + falsifiable proof test per the approved sequencing.

No code changes.

🤖 Generated with Claude Code

PR-P2-1 (prior-authority record hardening) merged as 3b83403. The
blocker table in internal/installer/uninstall/contract.md now shows
item 1 struck through with explicit LANDED status + merge SHA. Items
2-6 remain pending; each is still its own bounded PR with
micro-contract + falsifiable proof test per the approved sequencing.

No code changes.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@github-actions
Copy link
Copy Markdown
Contributor

github-actions Bot commented Apr 20, 2026

Dependency Review

✅ No vulnerabilities or license issues or OpenSSF Scorecard issues found.

Scanned Files

None

…uckets

Per review feedback: the table previously mixed code-semantic changes
with CI/gate additions, and said "all six items" when #1 is already
landed. Restructured for clarity:

- Landed bucket — #1 (prior-authority hardening, PR #484)
- Behavioral / semantic blockers — #2 (external-firewall detection
  unification), #6 (payload integrity minimum checks)
- Assurance / gate blockers — #3 (kernel/service snapshot CI),
  #4 (exec-trace CI), #5 (auto-elevate shim removal gate)

Wording tightened: "PR-23 starts only after all remaining pre-PR-23
blockers merge" instead of "all six items below."

Also flagged that PR-24/25/26 ordering is preferred, not dogmatic —
restore enforcement may expose facts that affect artifact-removal
semantics.

No code changes.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@itcmsgr itcmsgr merged commit 22eb85c into main Apr 20, 2026
57 checks passed
@itcmsgr itcmsgr deleted the chore/v1.100-blocker-tracking-pr-p2-1-landed branch April 20, 2026 06:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant