Skip to content

Upgrade to ANAF API v9 #7

Upgrade to ANAF API v9

Upgrade to ANAF API v9 #7

Triggered via pull request May 19, 2025 09:43
Status Failure
Total duration 19s
Artifacts

tests.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors
tests (8.3)
Process completed with exit code 1.
tests (7.4)
The operation was canceled.
tests (8.1)
The operation was canceled.
tests (7.4)
The strategy configuration was canceled because "tests._8_3" failed
tests (8.1)
The strategy configuration was canceled because "tests._8_3" failed
tests (8)
The operation was canceled.
tests (8)
The strategy configuration was canceled because "tests._8_3" failed
tests (7.2)
The operation was canceled.
tests (7.2)
The strategy configuration was canceled because "tests._8_3" failed
tests (7.3)
The operation was canceled.
tests (7.3)
The strategy configuration was canceled because "tests._8_3" failed
tests (7.1)
The operation was canceled.
tests (7.1)
The strategy configuration was canceled because "tests._8_3" failed
tests (8.2)
The operation was canceled.
tests (8.2)
The strategy configuration was canceled because "tests._8_3" failed