Skip to content

CI

CI #111

Manually triggered October 19, 2025 19:33
Status Failure
Total duration 55s
Artifacts

ci.yml

on: workflow_dispatch
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (26.3, 3.11)
Process completed with exit code 2.
test (29.1, 3.11)
The strategy configuration was canceled because "test._26_3_3_11" failed
test (29.1, 3.11)
The operation was canceled.
test (27.1, 3.11)
The strategy configuration was canceled because "test._26_3_3_11" failed
test (27.1, 3.11)
The operation was canceled.
test (29.4, 3.11)
The strategy configuration was canceled because "test._26_3_3_11" failed
test (29.4, 3.11)
The operation was canceled.
test (28.1, 3.11)
The strategy configuration was canceled because "test._26_3_3_11" failed
test (28.1, 3.11)
The operation was canceled.
test (30.1, 3.11)
The strategy configuration was canceled because "test._26_3_3_11" failed
test (30.1, 3.11)
The operation was canceled.