Skip to content

docker(deps): bump alpine from 3.22.1 to 3.22.2 in the docker group #123

docker(deps): bump alpine from 3.22.1 to 3.22.2 in the docker group

docker(deps): bump alpine from 3.22.1 to 3.22.2 in the docker group #123

Triggered via pull request November 5, 2025 21:39
Status Failure
Total duration 1m 9s
Artifacts 1

ci.yml

on: pull_request
Matrix: Test
Docker Build Test
48s
Docker Build Test
Dependency Review
5s
Dependency Review
Matrix: CodeQL Analysis / analyze
Docker Build & Push
0s
Docker Build & Push
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
Test (1.22.x)
Process completed with exit code 1.
Test (1.23.x)
The strategy configuration was canceled because "test._1_22_x" failed
Test (1.23.x)
Process completed with exit code 1.
Test (1.21.x)
The strategy configuration was canceled because "test._1_22_x" failed
Test (1.21.x)
The operation was canceled.
Test (1.24.x)
The strategy configuration was canceled because "test._1_22_x" failed
Test (1.24.x)
The operation was canceled.
Dependency Review
Unable to write summary to pull-request. Make sure you are giving this workflow the permission 'pull-requests: write'.
Test (1.22.x)
No files were found with the provided path: test-output.log coverage.out coverage.html. No artifacts will be uploaded.
Test (1.23.x)
No files were found with the provided path: test-output.log coverage.out coverage.html. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size Digest
kjanat~articulate-parser~YHHNN8.dockerbuild
42.3 KB
sha256:58de9be5db112864c1fecb5ffb39541d393a763a14e6b90497177abf247a78d3