-
Notifications
You must be signed in to change notification settings - Fork 54
Pull requests: kubevirt/ssp-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
chore(deps): Bump the production-dependencies group with 48 updates
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
#1846
opened Jul 8, 2026 by
dependabot
Bot
Loading…
chore: Improve logging when tests fail to delete SSP
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
lgtm
Indicates that a PR is ready to be merged.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
#1845
opened Jul 3, 2026 by
akrejcir
Collaborator
Loading…
chore(deps): Bump github.com/go-openapi/swag/jsonname from 0.25.5 to 0.27.0
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
#1844
opened Jul 1, 2026 by
dependabot
Bot
Loading…
fix: poll SSP status in test_id:6204 to wait for cluster to stabilize
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-approver-review
Indicates that a PR requires a review from an approver.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
#1810
opened May 11, 2026 by
geetikakay
Contributor
Loading…
chore(deps): Bump the production-dependencies group across 1 directory with 11 updates
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
#1808
opened May 11, 2026 by
dependabot
Bot
Loading…
chore(deps): update module github.com/moby/spdystream to v0.5.1 [security] (release-v0.19)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
lgtm
Indicates that a PR is ready to be merged.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
#1751
opened Apr 16, 2026 by
redhat-renovate-bot
Collaborator
Loading…
1 task
chore(deps): update module github.com/sirupsen/logrus to v1.9.1 [security] (release-v0.18)
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
#1633
opened Dec 8, 2025 by
redhat-renovate-bot
Collaborator
Loading…
1 task
chore(deps): update all dependencies
dco-signoff: yes
Indicates the PR's author has DCO signed all their commits.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
#1627
opened Dec 8, 2025 by
dominikholler
Contributor
Loading…
1 task
ProTip!
Add no:assignee to see everything that’s not assigned.