Skip to content

chore: Configure Renovate#14

Open
renovate[bot] wants to merge 1 commit intomainfrom
renovate/configure
Open

chore: Configure Renovate#14
renovate[bot] wants to merge 1 commit intomainfrom
renovate/configure

Conversation

@renovate
Copy link

@renovate renovate bot commented Mar 1, 2026

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • Cargo.toml (cargo)
  • ethereum_prover/Cargo.toml (cargo)
  • proof_verifier_js/wasm/Cargo.toml (cargo)
  • infra/docker-compose.yml (docker-compose)
  • .github/actions/runner-setup/action.yaml (github-actions)
  • .github/workflows/ci-check.yaml (github-actions)
  • .github/workflows/ci-release-please.yaml (github-actions)
  • .github/workflows/ci-release.yaml (github-actions)
  • .github/workflows/secrets_scanner.yaml (github-actions)
  • infra/dashboards/package.json (npm)
  • proof_verifier_js/demo/package.json (npm)
  • proof_verifier_js/ts/package.json (npm)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Hopefully safe environment variables to allow users to configure.
  • Show all Merge Confidence badges for pull requests.
  • Enable Renovate Dependency Dashboard creation.
  • Use semantic commit type fix for dependencies and chore for all others if semantic commits are in use.
  • Ignore node_modules, bower_components, vendor and various test/tests (except for nuget) directories.
  • Group known monorepo packages together.
  • Use curated list of recommended non-monorepo package groupings.
  • Show only the Age and Confidence Merge Confidence badges for pull requests.
  • Apply crowd-sourced package replacement rules.
  • Apply crowd-sourced workarounds for known problems with packages.
  • Ensure that every dependency pinned by digest and sourced from GitHub.com contains a link to the commit-to-commit diff
  • Correctly link to the source code for golang.org/x packages
  • Link to pkg.go.dev/... for golang.org/x packages' title

🔡 Do you want to change how Renovate upgrades your dependencies? Add your custom config to renovate.json in this branch. Renovate will update the Pull Request description the next time it runs.


What to Expect

With your current configuration, Renovate will create 32 Pull Requests:

chore(deps): update dependency @​grafana/grafana-foundation-sdk to v11.6.0-cogv0.0.x.1769699379
  • Schedule: ["at any time"]
  • Branch name: renovate/grafana-grafana-foundation-sdk-11.x-lockfile
  • Merge into: main
  • Upgrade @grafana/grafana-foundation-sdk to 11.6.0-cogv0.0.x.1769699379
chore(deps): update dependency @​types/node to v22.19.13
  • Schedule: ["at any time"]
  • Branch name: renovate/node-22.x-lockfile
  • Merge into: main
  • Upgrade @types/node to 22.19.13
chore(deps): update dependency vue to v3.5.29
  • Schedule: ["at any time"]
  • Branch name: renovate/vue-monorepo
  • Merge into: main
  • Upgrade vue to 3.5.29
chore(deps): update rust crate anyhow to v1.0.102
  • Schedule: ["at any time"]
  • Branch name: renovate/anyhow-1.x-lockfile
  • Merge into: main
  • Upgrade anyhow to 1.0.102
chore(deps): update rust crate clap to v4.5.60
  • Schedule: ["at any time"]
  • Branch name: renovate/clap-4.x-lockfile
  • Merge into: main
  • Upgrade clap to 4.5.60
chore(deps): update rust crate flate2 to v1.1.9
  • Schedule: ["at any time"]
  • Branch name: renovate/flate2-1.x-lockfile
  • Merge into: main
  • Upgrade flate2 to 1.1.9
chore(deps): update rust crate futures to v0.3.32
  • Schedule: ["at any time"]
  • Branch name: renovate/rust-futures-monorepo
  • Merge into: main
  • Upgrade futures to 0.3.32
chore(deps): update rust crate wasm-bindgen to v0.2.114
  • Schedule: ["at any time"]
  • Branch name: renovate/rust-wasm-bindgen-monorepo
  • Merge into: main
  • Upgrade wasm-bindgen to 0.2.114
chore(deps): update swatinem/rust-cache action to v2.8.2
  • Schedule: ["at any time"]
  • Branch name: renovate/swatinem-rust-cache-2.x
  • Merge into: main
  • Upgrade Swatinem/rust-cache to 779680da715d629ac1d338a641029a2f4372abb5
chore(deps): update actions/checkout action to v4.3.1
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-checkout-4.x
  • Merge into: main
  • Upgrade actions/checkout to 34e114876b0b11c390a56381ad16ebd13914f8d5
chore(deps): update actions/setup-node action to v6.2.0
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-setup-node-6.x
  • Merge into: main
  • Upgrade actions/setup-node to 6044e13b5dc448c55e2357c09f80417699197238
chore(deps): update foundry-rs/foundry-toolchain action to v1.7.0
  • Schedule: ["at any time"]
  • Branch name: renovate/foundry-rs-foundry-toolchain-1.x
  • Merge into: main
  • Upgrade foundry-rs/foundry-toolchain to 8789b3e21e6c11b2697f5eb56eddae542f746c10
chore(deps): update grafana/grafana docker tag to v11.6.12
  • Schedule: ["at any time"]
  • Branch name: renovate/grafana-monorepo
  • Merge into: main
  • Upgrade grafana/grafana to 11.6.12
chore(deps): update prom/prometheus docker tag to v2.55.1
  • Schedule: ["at any time"]
  • Branch name: renovate/prom-prometheus-2.x
  • Merge into: main
  • Upgrade prom/prometheus to v2.55.1
chore(deps): update rust crate alloy to v1.7.3
  • Schedule: ["at any time"]
  • Branch name: renovate/alloy-1.x-lockfile
  • Merge into: main
  • Upgrade alloy to 1.7.3
chore(deps): update rust crate tempfile to v3.26.0
  • Schedule: ["at any time"]
  • Branch name: renovate/tempfile-3.x-lockfile
  • Merge into: main
  • Upgrade tempfile to 3.26.0
chore(deps): update taiki-e/install-action action to v2.68.15
  • Schedule: ["at any time"]
  • Branch name: renovate/taiki-e-install-action-2.x
  • Merge into: main
  • Upgrade taiki-e/install-action to 68675c5a5f1a6950c3975d33f3ae0ef155e5bf3d
chore(deps): update trufflesecurity/trufflehog action to v3.93.6
  • Schedule: ["at any time"]
  • Branch name: renovate/trufflesecurity-trufflehog-3.x
  • Merge into: main
  • Upgrade trufflesecurity/trufflehog to 041f07e9df901a1038a528e5525b0226d04dd5ea
fix(deps): update rust crate base64 to 0.22.0
  • Schedule: ["at any time"]
  • Branch name: renovate/base64-0.x
  • Merge into: main
  • Upgrade base64 to 0.22.0
fix(deps): update rust crate getrandom to 0.4
  • Schedule: ["at any time"]
  • Branch name: renovate/getrandom-0.x
  • Merge into: main
  • Upgrade getrandom to 0.4
fix(deps): update rust crate reqwest to 0.13
  • Schedule: ["at any time"]
  • Branch name: renovate/reqwest-0.x
  • Merge into: main
  • Upgrade reqwest to 0.13
fix(deps): update rust crate toml to 0.9
  • Schedule: ["at any time"]
  • Branch name: renovate/toml-0.x
  • Merge into: main
  • Upgrade toml to 0.9
fix(deps): update sentry-rust monorepo to 0.46
  • Schedule: ["at any time"]
  • Branch name: renovate/sentry-rust-monorepo
  • Merge into: main
  • Upgrade sentry to 0.46
  • Upgrade sentry-anyhow to 0.46
chore(deps): update actions/checkout action to v6.0.2
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-checkout-6.x
  • Merge into: main
  • Upgrade actions/checkout to de0fac2e4500dabe0009e67214ff5f5447ce83dd
chore(deps): update dependency @​vitejs/plugin-vue to v6
  • Schedule: ["at any time"]
  • Branch name: renovate/vitejs-plugin-vue-6.x
  • Merge into: main
  • Upgrade @vitejs/plugin-vue to ^6.0.0
chore(deps): update dependency node to v24
  • Schedule: ["at any time"]
  • Branch name: renovate/node-24.x
  • Merge into: main
  • Upgrade node to 24.x
  • Upgrade node to 24
  • Upgrade @types/node to ^24.0.0
chore(deps): update dependency vite to v7
  • Schedule: ["at any time"]
  • Branch name: renovate/vite-7.x
  • Merge into: main
  • Upgrade vite to ^7.0.0
chore(deps): update grafana/grafana docker tag to v12
  • Schedule: ["at any time"]
  • Branch name: renovate/major-grafana-monorepo
  • Merge into: main
  • Upgrade grafana/grafana to 12.4.0
chore(deps): update prom/prometheus docker tag to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/prom-prometheus-3.x
  • Merge into: main
  • Upgrade prom/prometheus to v3.10.0
fix(deps): update rust crate bincode to v3
  • Schedule: ["at any time"]
  • Branch name: renovate/bincode-3.x
  • Merge into: main
  • Upgrade bincode to 3
fix(deps): update rust crate thiserror to v2
  • Schedule: ["at any time"]
  • Branch name: renovate/thiserror-2.x
  • Merge into: main
  • Upgrade thiserror to 2
fix(deps): update rust crate toml to v1
  • Schedule: ["at any time"]
  • Branch name: renovate/toml-1.x
  • Merge into: main
  • Upgrade toml to 1.0

🚸 PR creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or overwhelm the project. See docs for prHourlyLimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR was generated by Mend Renovate. View the repository job log.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants