Skip to content

🌱 Update openstack-ironic digest to eda12b9 (main)#963

Merged
metal3-io-bot merged 1 commit intomainfrom
renovate/main-openstack-ironic-digest
Apr 7, 2026
Merged

🌱 Update openstack-ironic digest to eda12b9 (main)#963
metal3-io-bot merged 1 commit intomainfrom
renovate/main-openstack-ironic-digest

Conversation

@renovate
Copy link
Copy Markdown
Contributor

@renovate renovate bot commented Apr 6, 2026

This PR contains the following updates:

Package Update Change
openstack-ironic digest f700d3deda12b9

Configuration

📅 Schedule: Branch creation - Between 12:00 AM and 05:59 AM, only on Monday ( * 0-5 * * 1 ) (UTC), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate bot added the ok-to-test Indicates a non-member PR verified by an org member that is safe to test. label Apr 6, 2026
@metal3-io-bot
Copy link
Copy Markdown
Contributor

Hi @renovate[bot]. Thanks for your PR.

I'm waiting for a metal3-io member to verify that this patch is reasonable to test. If it is, they should reply with /ok-to-test on its own line. Until that is done, I will not automatically test new commits in this PR, but the usual testing commands by org members will still work.

Regular contributors should join the org to skip this step.

Once the patch is verified, the new status will be reflected by the ok-to-test label.

I understand the commands that are listed here.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@metal3-io-bot metal3-io-bot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Apr 6, 2026
Copy link
Copy Markdown
Member

@Rozzii Rozzii left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/test metal3-centos-e2e-integration-test-main
/test metal3-ubuntu-e2e-integration-test-main

@Rozzii Rozzii moved this to Ironic-image WIP in Metal3 - Roadmap Apr 7, 2026
Copy link
Copy Markdown
Member

@Rozzii Rozzii left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

@metal3-io-bot
Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: Rozzii

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@metal3-io-bot metal3-io-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Apr 7, 2026
Copy link
Copy Markdown
Member

@tuminoid tuminoid left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@metal3-io-bot metal3-io-bot added the lgtm Indicates that a PR is ready to be merged. label Apr 7, 2026
@metal3-io-bot metal3-io-bot merged commit a9b2ccc into main Apr 7, 2026
19 checks passed
@metal3-io-bot metal3-io-bot deleted the renovate/main-openstack-ironic-digest branch April 7, 2026 07:35
@github-project-automation github-project-automation bot moved this from Ironic-image WIP to Done / Closed in Metal3 - Roadmap Apr 7, 2026
@metal3-io-bot metal3-io-bot added this to the ironic-image - v35.0 milestone Apr 7, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

Status: Done / Closed

Development

Successfully merging this pull request may close these issues.

3 participants