staged: worktree-20260606-211401 -> staged-be5700224e88-1780807796#698
Conversation
…-gate enforce Story 3ee4 (Option A enforce-flip) + cca8 DD2 riding the go-live. - required-checks.txt: merge-pipeline-checks OUT, review-gate IN (llm-review retained) - review-gate.yml: DSO_REVIEW_GATE_MODE warn -> enforce - update-required-checks-manifest.sh / promote-ruleset-required.sh: MAIN staged check swapped to review-gate (+ their tests). The merge-pipeline-checks JOB is retained in ci.yml (still fires on the sub-PR path); it is removed only from the MAIN ruleset required set. Live ruleset 15629023 provisioned (admin, atomic surgical PATCH): review-gate IN / merge-pipeline-checks OUT, required_linear_history added, allowed_merge_methods=[rebase], bypass identity 207596960 preserved. R5/R8 roundtrip green post-provision; ruleset-design-invariants green under the non-admin identity (I4/I7 = never). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
DSO-Story: worktree-20260606-211401
|
Important Review skippedAuto reviews are disabled on base/target branches other than the default branch. 🗂️ Base branches to auto review (1)
Please check the settings in the CodeRabbit UI or the ⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: ASSERTIVE Plan: Pro Run ID: You can disable this status message by setting the Use the checkbox below for a quick retry:
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
DSO-Review-Cycle: 1 pr_number=698 commit_sha=58408f5a19c054bef3d12469726d8e5b1660711e findings_hash=6db2a419ab0c0822 tuples=[["tests/scripts/test-validate-required-checks.sh", "", "maintainability"]] |
Staged promotion (PR-C two-PR flow)
This is the first PR of a two-PR session→main promotion. The worktree branch
worktree-20260606-211401is being merged into the staged refstaged-be5700224e88-1780807796, which was created fromorigin/mainHEAD.The sub-PR ruleset's
required_workflowsrule requiresreview-sub-prto run successfully on this PR before merge. Once this PR merges, the merge-to-main script will open PR2 fromstaged-be5700224e88-1780807796→main.🤖 Generated by merge-to-main-pr.sh