[Snyk] Upgrade mongoose from 6.11.1 to 7.2.2 #43
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
backend-ci-action.yml
on: pull_request
Matrix: build
finish
0s
Annotations
6 errors
build (16.x)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
build (16.x)
The operation was canceled.
|
build (14.x)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
build (14.x)
The operation was canceled.
|
build (18.x)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
|
build (18.x)
The operation was canceled.
|