Skip to content

fix: update MaaS tests for subscription binding and fix gateway 500 e…#1317

Merged
dbasunag merged 1 commit intoopendatahub-io:3.4ea2from
SB159:cherry-pick-1303-to-3.4ea2
Mar 27, 2026
Merged

fix: update MaaS tests for subscription binding and fix gateway 500 e…#1317
dbasunag merged 1 commit intoopendatahub-io:3.4ea2from
SB159:cherry-pick-1303-to-3.4ea2

Conversation

@SB159
Copy link
Copy Markdown
Contributor

@SB159 SB159 commented Mar 27, 2026

…… (#1303)

  • fix: update MaaS tests for subscription binding and fix gateway 500 error

  • address review comment


Pull Request

Summary

Related Issues

  • Fixes:
  • JIRA:

Please review and indicate how it has been tested

  • Locally
  • Jenkins

Additional Requirements

  • If this PR introduces a new test image, did you create a PR to mirror it in disconnected environment?
  • If this PR introduces new marker(s)/adds a new component, was relevant ticket created to update relevant Jenkins job?

opendatahub-io#1303)

* fix: update MaaS tests for subscription binding and fix gateway 500 error

Signed-off-by: Swati Mukund Bagal <sbagal@redhat.com>

* address review comment

Signed-off-by: Swati Mukund Bagal <sbagal@redhat.com>

---------

Signed-off-by: Swati Mukund Bagal <sbagal@redhat.com>
@github-actions
Copy link
Copy Markdown

The following are automatically added/executed:

  • PR size label.
  • Run pre-commit
  • Run tox
  • Add PR author as the PR assignee
  • Build image based on the PR

Available user actions:

  • To mark a PR as WIP, add /wip in a comment. To remove it from the PR comment /wip cancel to the PR.
  • To block merging of a PR, add /hold in a comment. To un-block merging of PR comment /hold cancel.
  • To mark a PR as approved, add /lgtm in a comment. To remove, add /lgtm cancel.
    lgtm label removed on each new commit push.
  • To mark PR as verified comment /verified to the PR, to un-verify comment /verified cancel to the PR.
    verified label removed on each new commit push.
  • To Cherry-pick a merged PR /cherry-pick <target_branch_name> to the PR. If <target_branch_name> is valid,
    and the current PR is merged, a cherry-picked PR would be created and linked to the current PR.
  • To build and push image to quay, add /build-push-pr-image in a comment. This would create an image with tag
    pr-<pr_number> to quay repository. This image tag, however would be deleted on PR merge or close action.
Supported labels

{'/cherry-pick', '/hold', '/lgtm', '/verified', '/wip', '/build-push-pr-image'}

@dbasunag dbasunag merged commit 3bc5861 into opendatahub-io:3.4ea2 Mar 27, 2026
9 checks passed
@github-actions
Copy link
Copy Markdown

Status of building tag 3.4ea2: success.
Status of pushing tag 3.4ea2 to image registry: success.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants