-
Notifications
You must be signed in to change notification settings - Fork 1.9k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
skip CI steps for konflux chnages and remove Sonar jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#64513
opened May 5, 2025 by
coleenquadros
Loading…
OPRUN-3878: release-4.18: Add periodics for openshift-operator-framework-olm-release
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64511
opened May 5, 2025 by
camilamacedo86
Loading…
OPRUN-3805: Add new job for periodics and ensure that 4.18 has periodics
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64510
opened May 5, 2025 by
camilamacedo86
Loading…
OCPBUGS-55643: equinix-ocp-metal-quota-slice raised to 110
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#64509
opened May 5, 2025 by
tdomnesc
Loading…
Remove rhtap-cli periodic jobs
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#64508
opened May 5, 2025 by
jkopriva
Loading…
WIP: test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#64507
opened May 5, 2025 by
danmanor
Loading…
k-nmstate: automagically fix golang dependencies
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#64504
opened May 5, 2025 by
mkowalski
Loading…
[WIP] Test CI Stability with s1022 Host for Periodic Hypershift Power
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#64502
opened May 5, 2025 by
aman4433
Loading…
tag/rust:boot-root-1.79.0 fix PATH
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#64498
opened May 4, 2025 by
hongkailiu
Loading…
draft: Add support to install cluster on the nutanix platform
#64497
opened May 4, 2025 by
mhanss
Loading…
[WIP] Try oc adm mirror without bastion
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#64495
opened May 3, 2025 by
sebsoto
Loading…
NO-JIRA: mirror cincinnati-ci-public/rust:boot-root-1.79.0 to QCI
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#64492
opened May 2, 2025 by
hongkailiu
Loading…
[4.19] ci-deps kubernetes set to optional
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#64490
opened May 2, 2025 by
ashwindasr
Loading…
NO-JIRA: Add troubleshooting panel unit tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64488
opened May 2, 2025 by
PeterYurkovich
Loading…
[DEBUG] [DO NOT MERGE] on kata
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#64487
opened May 2, 2025 by
wainersm
Loading…
CNTRLPLANE-777: Update cron schedule for e2e-aks periodic job to run every 6 hours for 4.20
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64485
opened May 2, 2025 by
bryan-cox
Loading…
OCPCLOUD-2893: Add CAPI infra objects to gather-extra
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64484
opened May 2, 2025 by
honza
Loading…
Fix seed image ref
lgtm
Indicates that a PR is ready to be merged.
#64480
opened May 2, 2025 by
jc-rh
Loading…
ACS: Sort out GKE oldest/latest jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#64478
opened May 2, 2025 by
msugakov
Loading…
[WIP] WINC-1394: Use oc-mirror for WMCO workflow
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#64477
opened May 2, 2025 by
sebsoto
Loading…
WIP: Add a new workflow to test e2e custom-dns on GCP
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#64475
opened May 2, 2025 by
sadasu
Loading…
Previous Next
ProTip!
Follow long discussions with comments:>50.