16 changes: 16 additions & 0 deletions projects/prisma-8-rc1/README.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,16 @@
# Prisma 8 RC1

**The goal: on July 31 2026 we publish `prisma@8.0.0-rc.1` from the `prisma/prisma` repository and announce it.** Prisma Next becomes Prisma 8. Users arrive at the same GitHub repository and the same npm package they have always used, and what they find there is the new ORM.

These documents carry the full context, from the high-level goals down to concrete steps. They deliberately do not say who does what — ownership lives in [Linear](https://linear.app/prisma-company/project/prisma-8-rc1-7592265f700c).

Read them in order:

1. **[What the release is](release-definition.md)** — what "RC" means for us, what freezes on July 31, what we promise, and what we deliberately don't.
2. **[How we can tell it's correct](scoreboard.md)** — the feature-support matrix, the side-by-side proof, and the benchmarks. The matrix doubles as the public scoreboard and generates the to-do list.
3. **[The remaining feature set and work](feature-surface.md)** — what ships stable, what ships experimental, what's explicitly out, and the engineering that must land before the freeze.
4. **[The repository and package migration](repo-migration.md)** — the mechanical steps to move into prisma/prisma and onto the `prisma` npm package.
5. **[Running v7 and v8 in parallel](parallel-install.md)** — the incremental migration story we're promising users, and how it actually works.
6. **[The plan](plan.md)** — everything above as dated, ordered steps.

Decision history and rejected alternatives are in [design-notes.md](design-notes.md). The formal acceptance criteria are in [spec.md](spec.md).
77 changes: 77 additions & 0 deletions projects/prisma-8-rc1/design-notes.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,77 @@
# Prisma 8 RC1 — Design Notes

The settled decisions behind [spec.md](spec.md), each with its rationale. Alternatives considered are collected at the end. These were settled in operator discussion, July 15 2026.

## The release is an RC, and that defines the cut line

"GA by July 31" reframed as **Prisma 8.0.0-rc.1**. An RC freezes API surface; it does not promise completeness. That gives every work item a mechanical classification: it either affects frozen surface (must land before Jul 31) or it doesn't (may trail). The freeze set: package names, error codes, config keys, the `migrations/` directory layout, CLI bin names, version floors. The release bar is "everything we ship works, and we're confident" — not v7 parity.

## Version number: 8

Skipping to 10 buys a vague "big jump" signal at the cost of permanent "what happened to 8 and 9" noise; the discontinuity story is already told by the architecture and the marketing. The RC publishes under a non-`latest` dist-tag so `npm install prisma` keeps resolving to v7 until 8.0.0 final — nobody gets v8 by accident, which defuses most same-package-name risk.

## Repo merge: on a branch early, to main at the end

The v8 branch lands in `prisma/prisma` immediately and runs full CI for weeks; merge mechanics (history graft, CI wiring, publish pipeline) are proven long before release week. The mass issue-close (everything except v7 bugs) happens **at merge time** with a pinned explanation issue — doing it early generates weeks of confused reactions with no announcement to point at. v7 history lives on a `v7` maintenance branch: bug fixes for **12 months, clock starting at 8.0.0 final** (not RC — an RC-dated clock silently shortens the promise if final slips, and generosity toward the v7 base is the right trade given low EA uptake).

## Parallel install: three collision surfaces, three answers

1. **npm names.** No collisions: Prisma Next has its own package set and no client in v7's sense, so `@prisma/client` stays v7-only. Library-level coexistence is the documented alias pattern (`"prisma-v7": "npm:prisma@^7"`).
2. **The CLI bin.** v8's `prisma` package ships **exactly one binary: `prisma-next`** — it deliberately does not declare a `prisma` bin at RC. Reasoning: when two installed packages declare the same binary name, which one wins `node_modules/.bin` is package-manager-specific and effectively undocumented, so a coexistence story that depends on "v7 wins the collision" is nondeterministic across npm/pnpm/Yarn/Bun. With only `prisma-next` declared, there is no collision at all: `prisma` unambiguously means v7 on every package manager until v7 is removed. Whether v8 ever adds a bare `prisma` binary (at 8.0.0 final, or later via `@prisma/cli`) is deliberately deferred — v8's commands share nothing with v7's, so v7 muscle memory doesn't transfer regardless of the binary's name, and adding a bin later is purely additive.
3. **Migration ownership.** Two migration systems must never both mutate one schema. **v7 owns migrations until a single final cutover.** v8 adopts the database read-only via the shipped, e2e-tested brownfield path (ADR 122): `contract infer` → `db sign` (which verifies the live schema satisfies the contract before writing anything, then records only a marker in the reserved `prisma_contract` schema — it never touches `_prisma_migrations`). After each v7 migration during coexistence: re-infer, review the diff, re-sign; `db verify --schema-only` in CI. At cutover: final sign against the last v7-migrated state, then normal v8 migration flow.

**Known wrinkle:** v7 puts `_prisma_migrations` in `public`, so it is an "unclaimed element" to v8 — tolerated by default `db verify`, but a failure under `--strict` and flagged by `db init`. The upgrade guide blesses **lenient mode until cutover** (one paragraph) rather than building an ignore/allowlist mechanism (a feature nobody needs after the transition).

**Known gaps on this path:** the Dub.co side-by-side evaluation (WS1 M4) never ran — the fixture (plan S1) is the first real test of the coexistence claim. `migration plan --advance` (TML-2560) is documented but unimplemented; it sits on the *cutover* path, not the parallel-run path, so it is a named public gap for final, not an RC blocker. Brownfield step-count ergonomics are tracked as TML-2561.

## Packaging: rename only the visible set; consolidation is already designed

The repo publishes 65 lockstep-versioned packages, but npm existence isn't the ratchet — **blessing is**. ADR 211 already defines the end state: the unscoped bin-only shim plus the three target facades are the entire user-facing surface; everything else is implementation detail, and Flavor 2 (TML-2265) later bundles internals into the shim so they stop being published — non-breaking, hence deferred past RC. So the July move is small: the shim becomes `prisma@8.0.0-rc.1`, and the facades become `@prisma/postgres` / `@prisma/sqlite` / `@prisma/mongo` **at RC** (RC is the freeze moment — renaming between RC and final would break the one promise an RC makes). The rename set is collision-audited against classic-owned `@prisma/*` names (`client`, `config`, `engines`, `adapter-*`, …) because parallel-installed users resolve both scopes simultaneously. All other `@prisma-next/*` packages stay published and untouched.

The repo rename (`prisma/prisma` → `prisma/prisma-orm`) is parked: GitHub redirects make it cheap whenever it happens, and it doesn't need to ride along with the merge.

## Version floors: already ratified, one under revisit

ADR 222 ratified Node ≥24, TS ≥5.9 (optional peer), ESM-only, Postgres 17, MongoDB 8.0 — so "clear Node + TS version requirements" is announcement copy, not engineering. Node ≥24 and ESM-only are themselves headline breaking changes and lead the upgrade guide. The **Postgres 17 floor was an EA-era convenience** and is being revisited (decision due Jul 22): the migrating-from-v7 audience skews to older Postgres, and a floor that excludes them contradicts the incremental-migration promise. Each supported floor version is a permanent CI matrix row — that cost is the decision.

## Error codes: one scheme, decided before the freeze

The current state is four parallel error models with two incompatible code formats (~46 `PN-DOMAIN-NNNN` in the CLI layer, ~89 dotted `NAMESPACE.SUBCODE` in the runtime and migration-tools layers), ~16 codeless bespoke classes, and no central registry — ADR 027's factory/registry/redaction spec is unimplemented. The consistency pass is mechanical and parallelizable *once a scheme is ratified*; the ratification (due Jul 18) is the bottleneck. Recommendation on the table: **dotted wins** (twice the usage, self-describing), with a published crosswalk for the PN codes per ADR 027's own stability policy. Codes freeze at RC; message wording and golden-test scaffolding may trail. There is deliberately **no classic P-code compatibility** — the clean break already shipped; the upgrade guide gets a P-code → new-code mapping table for the runbook-migration crowd instead.

## Migration snapshot centralization: pre-freeze by necessity

Every migration directory currently carries redundant contract copies; a chain of M migrations stores ~2M contracts where M+1 distinct ones exist. The fix is content-addressed storage — `migrations/snapshots/<storageHash>.json` — mirroring the `prisma_contract.contract` table the database side already has. Migration dirs need no link files: `migration.json` already carries the from/to hashes, so the contract-reference resolver learns the snapshot store and the change concentrates in resolver + emitter (+ example regeneration). This is **safe** because ADR 199 excludes snapshots from migration identity (hash covers manifest + ops only) — nothing invalidates. It is **urgent** because the `migrations/` layout becomes frozen public surface at RC. Compression: writer emits plain JSON (git packs already delta-compress; gzipped blobs cost PR reviewability and greppability), but the reader accepts `.json.gz` from day one so compression remains a future non-breaking writer-side option.

## Testing: mine P7, don't convert it

The P7 functional suite is thousands of tests against a different API; wholesale conversion is months. The valuable artifact is the **database and relational-algebra edge cases encoded in it**. Two moves: (1) extract those scenarios, filtered by the supported-surface matrix, into the existing `test/integration/` + `test/e2e/` per-target structure — the matrix and the converted tests become the same artifact, making "everything we ship works" checkable; (2) differential testing through the side-by-side fixture where v7-as-oracle beats hand-porting assertions. With thin EA adoption, this suite does the confidence work production feedback normally would.

## Benchmarks: public Bencher, measurements only

TS performance is measured **before** the type freeze (deep conditional types are exactly the pattern that blows up check time at schema scale — if the numbers are bad, the runway to fix types exists only pre-freeze). Public surface: a **Bencher project (public, free for OSS)** carrying per-commit series — `tsc --extendedDiagnostics` check time, type instantiations, memory — split by schema size (10/100/500 models) and TS version (5.9, 7). **Measurements only, no v7 or competitor comparison**: fair comparison is hard, and a comparative claim makes the benchmark the story. PR regression checks fail on **instantiation counts** (deterministic) rather than wall time (CI-runner jitter). Consequence, accepted: the announcement can't say "dramatically faster types" with a public receipt — wording is calibrated against one internal v7 comparison run, or softened to what the dashboard shows.

## Dashboards

- **Pre-RC, org-internal:** the Linear project *is* the dashboard — milestones carry the checkpoints, status updates land at each one, and tickets are created just-in-time (an exhaustive up-front backlog was explicitly rejected as waste under a fast-changing plan). Any separate internal page is a second copy of Linear that goes stale.
- **Post-RC, public:** the rendered supported-surface matrix **is** the dashboard — a grid of ticks and crosses regenerated by CI from the checked-in data. There is no separate progress board: cells flipping from cross to tick as proving suites go green *is* the distance-to-done reading. Ticks link to the suite that proves them; deliberate crosses are the not-in-8.0 list and link to gap issues on an `8.0.0` milestone. Promises limited to: API stability with named experimental carve-outs, the 12-month v7 window, **promotion criteria instead of a date** (every cell green or explicitly not-in-8.0; N weeks without a new release-blocker; the migration recipe passing its fixture), the explicit not-in-8.0 list, and a biweekly status cadence. Rule: nothing goes public that we aren't willing to be held to in a GitHub thread six weeks later — per-feature dates fail that test.

## Staffing

Will (lead: merge, npm ops, decisions, announcement, and the agent-executed engineering under his review), Serhii (coexistence fixture, then test mining), Alexey (polymorphism, untouched, through the go/no-go). Agent-executed work lands as bot PRs and costs Will review time, not implementation time — the split that keeps the lead off the critical path for everything except the things only the lead can do.

## Alternatives considered

- **Version 10** — rejected: permanent numbering noise for a signal the marketing already carries.
- **Reusing classic P-codes (P1001-style)** — rejected: zero compatibility exists in the codebase by design; retrofitting would break EA users to please v7 muscle memory. A mapping table in the upgrade guide serves the runbook crowd instead.
- **`prisma8` as the coexistence bin** — rejected in favor of keeping `prisma-next`: it already exists and EA users already use it; no second habit migration.
- **v8 claiming the `prisma` bin during coexistence** — rejected: breaks every existing v7 script and CI job on install.
- **v8 shipping both `prisma` and `prisma-next` bins ("v7 wins the collision")** — rejected, superseding an earlier version of this plan: bin-collision winners are package-manager-specific and undocumented, so the coexistence behavior would be nondeterministic. The RC ships `prisma-next` only.
- **Both migration systems owning DDL** — rejected: requires reconciliation machinery that doesn't exist; single-owner-until-cutover is the shipped, tested model.
- **An ignore/allowlist mechanism for v7's `_prisma_migrations` under `db verify --strict`** — rejected for now: lenient-mode guidance is one paragraph; the allowlist is a feature with a lifespan of one transition.
- **Renaming all 65 packages to `@prisma/*` at RC** — rejected: blesses ~65 names as frozen public API; only the visible set (shim + facades) is user-facing per ADR 211.
- **ADR 211 Flavor 2 bundling before RC** — rejected: non-breaking later, unnecessary risk in a 13-day window.
- **Wholesale P7 test-suite conversion** — rejected: months of work porting assertions written against a different API; mining + differential testing capture the value.
- **Comparative public benchmarks (v7, competitors)** — rejected: fair methodology is its own project, and the comparison becomes the story.
- **Hand-curated public roadmap page** — rejected: goes stale in weeks; every stale cell reads as a broken promise. Derive from maintained sources or don't publish.
- **Exhaustive up-front Linear backlog** — rejected by the operator: the plan changes too fast; milestones + just-in-time tickets instead.
- **Gzipping snapshots at write time** — deferred: dedup is the big win; git already compresses; reviewability wins. Reader-side `.gz` tolerance ships so the option stays open without a second layout break.