Skip to content

Advanced Tests (nightly) #925

Advanced Tests (nightly)

Advanced Tests (nightly) #925

Triggered via schedule March 14, 2025 00:19
Status Failure
Total duration 1h 37m 37s
Artifacts

nightly-tests.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.8, 1.5.1)
Process completed with exit code 1.
build (3.10, 1.5.1)
The operation was canceled.
build (3.10, 1.5.1)
The strategy configuration was canceled because "build._3_8_1_5_1" failed
build (3.12, 1.5.1)
The operation was canceled.
build (3.12, 1.5.1)
The strategy configuration was canceled because "build._3_8_1_5_1" failed
build (3.11, 1.5.1)
The operation was canceled.
build (3.11, 1.5.1)
The strategy configuration was canceled because "build._3_8_1_5_1" failed
build (3.9, 1.5.1)
The operation was canceled.
build (3.9, 1.5.1)
The strategy configuration was canceled because "build._3_8_1_5_1" failed