Skip to content

build: go version

build: go version #5

Triggered via push September 20, 2025 16:30
Status Failure
Total duration 45s
Artifacts 1

development.yaml

on: push
Build Development Docker Image
41s
Build Development Docker Image
Matrix: Test and Build
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test and Build (1.24.1, arm64)
Process completed with exit code 1.
Test and Build (1.24.1, amd64)
The operation was canceled.
Test and Build (1.24.1, amd64)
The strategy configuration was canceled because "test._1_24_1_arm64" failed
Build Development Docker Image
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/sh -c CGO_ENABLED=0 go build -ldflags=\"-s -w -X github.com/pyrohost/elytra/src/system.Version=$VERSION\" -v -trimpath -o elytra ./src/cmd/elytra" did not complete successfully: exit code: 1

Artifacts

Produced during runtime
Name Size Digest
pyrohost~elytra~WBMZMK.dockerbuild
47.2 KB
sha256:64b4fb2b9db640a4d843f4f8718273f6d0dba5702b145fc3ad2324746658fae2