Skip to content

progress bar

progress bar #3755

Triggered via push November 18, 2025 12:41
Status Failure
Total duration 10m 10s
Artifacts

test.yml

on: push
Matrix: msys2-build-test
Matrix: test-native
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test-native (ubuntu-latest)
Process completed with exit code 101.
test-native (windows-latest)
The strategy configuration was canceled because "test-native.ubuntu-latest" failed
test-native (windows-latest)
The operation was canceled.
test-native (macos-latest)
The strategy configuration was canceled because "test-native.ubuntu-latest" failed
test-native (macos-latest)
The operation was canceled.
msys2-build-test (CLANG64)
Process completed with exit code 101.
msys2-build-test (MINGW64)
The strategy configuration was canceled because "msys2-build-test.CLANG64" failed
msys2-build-test (MINGW64)
The operation was canceled.
msys2-build-test (UCRT64)
The strategy configuration was canceled because "msys2-build-test.CLANG64" failed
msys2-build-test (UCRT64)
The operation was canceled.