chore(deps): update konflux references#39
Open
red-hat-konflux[bot] wants to merge 1 commit into
Open
Red Hat Konflux / Red Hat Konflux / openshift-gitops-operator-enterprise-contract / pr group
cancelled
Jul 4, 2026 in 31m 18s
Failed
Integration test for pr group snapshot scenario openshift-gitops-operator-enterprise-contract has not run and is considered as failed because the build pipelinerun failed and snapshot was not created
Details
build pipelinerun rh-openshift-gitops-tenant/gitops-must-gather-on-pull-request-5pb5l failed, so that snapshot is not created. Please fix build pipelinerun failure and try again.
Loading