Skip to content

chore(deps): lock file maintenance #2969

chore(deps): lock file maintenance

chore(deps): lock file maintenance #2969

Triggered via pull request March 17, 2025 06:35
Status Failure
Total duration 46s
Artifacts

node-ci.yml

on: pull_request
Matrix: verify-matrix
verify-dev
34s
verify-dev
Fit to window
Zoom out
Zoom in

Annotations

5 errors
verify-matrix (20.6.1)
Process completed with exit code 1.
verify-matrix (18.17.0)
The operation was canceled.
verify-matrix (18.17.0)
The strategy configuration was canceled because "verify-matrix._20_6_1" failed
verify-dev
Process completed with exit code 1.
verify
Process completed with exit code 1.