Skip to content

Update topology workspace to commit e0bcbe4 for backstage 1.45.3 on branch main#99

Open
github-actions[bot] wants to merge 1 commit into
mainfrom
workspaces/main__topology
Open

Update topology workspace to commit e0bcbe4 for backstage 1.45.3 on branch main#99
github-actions[bot] wants to merge 1 commit into
mainfrom
workspaces/main__topology

Conversation

@github-actions

Copy link
Copy Markdown

Update topology workspace at commit backstage/community-plugins@e0bcbe4 for backstage 1.45.3 on branch main.

This PR was created automatically.
Click on the following link to see the source diff it introduces: backstage/community-plugins@1c6a19a...e0bcbe4.

Before merging, you need to export the workspace dynamic plugins as OCI images,
and if possible test them inside a RHDH instance.

To do so, you can use the /publish instruction in a PR review comment.
This will start a PR check workflow to:

  • export the workspace plugins as dynamic plugins,
  • publish them as OCI images
  • push the oci-images in the GitHub container registry with a PR-specific tag.

@github-actions github-actions Bot added mandatory-workspace PR affects a workspace with required plugins for releases workspace-update PR modifies files in an existing workspace labels Jan 14, 2026
@github-actions

Copy link
Copy Markdown
Author

A new workspace commit e905b5459be81d05e13f6779684fc9f4cbcf3d28 has been discovered (match type: 'exact').
You can update this PR with the latest discovered workspace source commit.

To do so, you can use the /update-commit instruction in a PR review comment.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

mandatory-workspace PR affects a workspace with required plugins for releases needs-commit-update workspace-update PR modifies files in an existing workspace

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants