Skip to content

Merge conflict

Merge conflict #816

Triggered via push March 5, 2025 07:04
Status Failure
Total duration 56s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 1.
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed