Milestones

List view

  • PQC-signed Releases + Edge ISR + 1.0 RC Hardening

    No due date
    1/7 issues closed
  • WASI Plugin Sandbox + Semantic Search + Hand-rolled MCP

    No due date
    1/10 issues closed
  • Dev UX + HMR + Subcommand Surface

    No due date
    1/4 issues closed
  • Real Incremental + IoPool (tokio-free) + lol_html finish

    No due date
    2/10 issues closed
  • Concurrency Proofs + Fuzz + Supply-Chain Rotation

    No due date
    1/7 issues closed
  • Bridge patch — DX & correctness. 3 items: hreflang automation (moved from v0.0.42), lol_html streaming AST replacement (moved from v0.0.44), unified CLI subcommands (moved from v0.0.44). Target: between v0.0.42 and v0.0.44.

    Due by August 18, 2026
    4/4 issues closed
  • Phase 3 (per ROADMAP.md, retargeted to a patch milestone for shipping cadence) — The Enterprise and Production Patch. 5 items: WASM plugin sandboxing, local semantic vector search (Local RAG), Server Islands + WASM edge, async/io_uring I/O, SLSA v1.1 + SPDX 3.0 compliance. Target: 6-12 months.

    Due by December 22, 2026
    9/13 issues closed
  • Phase 2 (per ROADMAP.md, retargeted to a patch milestone for shipping cadence) — The Credibility and Incremental Patch. 5 items: DepGraph + --incremental, lol_html streaming AST, event watcher + component HMR, unified CLI subcommands, deterministic LLM inference cache. Target: 2-3 months.

    Due by September 22, 2026
    17/17 issues closed
  • Phase 1 (per ROADMAP.md) — The Robustness and Correctness Patch. 5 items: native minification, LlmPlugin ureq port, AVIF, hreflang automation, JSON Feed 1.1. Target: 1-2 weeks.

    Overdue by 4 day(s)
    Due by July 13, 2026
    5/5 issues closed
  • Multi-week features deferred from v0.0.39: WASM playground, WASI Preview 2, edge deploys, interactive bench report, TOON analytics/workflow/theming, enterprise deploy adapters.

    No due date
    6/6 issues closed
  • Stabilise the public API, ship spatial computing output, MDX-equivalent rich content, and declare SSG the embeddable compliance-ready Rust build engine.

    Due by June 29, 2027
    5/5 issues closed
  • Harden for regulated industries: post-quantum content provenance, SBOM attestation, WCAG 2.2/3.0, automated accessibility CI, and OpenTelemetry build traces.

    Due by February 27, 2027
  • Architect SSG as the build engine powering TOON. Push-button deployment, multi-tenant theming, and compliance-grade provenance signing.

    Due by December 30, 2026
    17/17 issues closed