chore(deps): update npm to v11.6.4 #5288
test.yml
on: pull_request
Matrix: test_matrix
test_dev
38s
test
3s
Annotations
6 errors
|
test_matrix (22.14.0, ubuntu-latest)
Process completed with exit code 1.
|
|
test_matrix (24.10.0, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._22_14_0_ubuntu-latest" failed
|
|
test_matrix (24.10.0, ubuntu-latest)
The operation was canceled.
|
|
test_matrix (24, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._22_14_0_ubuntu-latest" failed
|
|
test_matrix (24, ubuntu-latest)
The operation was canceled.
|
|
test
Process completed with exit code 1.
|