Milestones
List view
The five-law constitution (ratified 2026-07-20) as conditions: everything crossing a boundary carries a contract (types · errors · effects · bounds · determinism · protocol) · every composition proven, Unknown never dressed as success · every dynamic verification attributable, no capability beyond its type. Lands before 1.0. SSOT: https://github.com/supernovae-st/nika-spec/blob/main/timeline/timeline.yaml · rendered: https://nika.sh/timeline#gates
No due date•0/1 issues closedLands WHOLE before 1.0: a declared pre-condition of the official launch (D-2026-07-22-N1 · the whole sovereign memory, not merely capabilities). Conditions: the connectome orchestrator + its satellites admitted through the same 12 gates · recall/ingest as builtin tools under invoke (never a new verb) · the zero-LLM write path · an exportable store on open standards, digests pinned in receipts. SSOT: https://github.com/supernovae-st/nika-spec/blob/main/timeline/timeline.yaml · rendered: https://nika.sh/timeline#gates
No due date•0/1 issues closedrc green + feedback absorbed + real traction, honestly measured + a launch crafted to the same bar as the language + the Scorecard bar met. Conditions, never dates. SSOT: https://github.com/supernovae-st/nika-spec/blob/main/timeline/timeline.yaml · rendered: https://nika.sh/timeline#gates
No due dateThe declared pre-condition of the official 1.0: every mechanical check at 10, a second reviewer, the best-practices badge. SSOT: https://github.com/supernovae-st/nika-spec/blob/main/timeline/timeline.yaml · rendered: https://nika.sh/timeline#gates
No due date•0/1 issues closedCondition-gated, never date-gated. Flips when the rc gate is green and design partners run real workflows with feedback rounds absorbed. SSOT: the spec timeline gates (https://github.com/supernovae-st/nika-spec/blob/main/timeline/timeline.yaml) · rendered: https://nika.sh/timeline#gates
No due date•0/2 issues closed